|
|
Project Name : Recover |
Description :
The role of Restoration Coordination and Verification (RECOVER) is to organize and apply scientific and technical information in ways that are most effective in supporting the objectives of the Comprehensive Everglades Restoration Plan. RECOVER links science and the tools of science to a set of system-wide planning, evaluation and assessment tasks. These links provide RECOVER with the scientific basis for meeting its overall objectives of evaluating and assessing Comprehensive Plan performance, refining and improving the plan during the implementation period, and ensuring that a system-wide perspective is maintained throughout the restoration program. |
URL :
http://www.evergladesplan.org/pm/recover/recover.cfm |
Additional Project Documents
Document Name
|
View As HTML
|
Document Description
|
Date Loaded
|
|
SFWMM Improvements & 2000 Existing Condition |
N/A |
Overview: SFWMM Improvements and Modeling Assumptions for 2000 Existing Condition
Presentation to Regional Evaluation Team meeting, 10/7/03, Vero Beach. |
2005-04-22 13:25:06.0 |
|
Natural System Model v4.pdf |
N/A |
Natural System Model v4.6. Presentation to Regional Evaluation Team meeting, 10/7/03, Vero Beach
Comparison of NSM4.6 results relative to NSM4.5 |
2005-04-22 13:27:20.0 |
|
2050 Base Future Without Project |
N/A |
Overview: Modeling Assumptions and Results for 2050 Base, Future Without Project Condition. Presentation to the Regional Evaluation Team, 12/11/03 |
2005-04-22 13:28:16.0 |
|
Initial CERP Update (CERP0/1) Presentation |
(HTML File) |
The Initial CERP Update: Modeling of the Comprehensive Plan (D13R Update). Presentation to RECOVER Initial CERP Update Team by the Interagency Modeling Center, 04/6/04.
|
2005-04-22 13:29:31.0 |
|