Description :
CERPA is the latest simulation of the CERP (D13R), using version 5.4.3 of the SFWMM. CERPA modeling mimics closely the structural and operational intent of D13R, using the new tool. It was adapted from the CERP0 scenario with the following differences:
- Expanded stormwater treatment areas associated with the Acceler8 Everglades Construction Project configuration (as in the 2050B3)
- Updated climate forecasts as in 2050B3
- Lake Okeechobee operational lines for ASR injection and deliveries to North of Lake Storage and EAA Reservoir the same as in D13R
- ASR recovery line modified due to changes in the supply side management line
- Offsets, translations, and truncations to NSM targets use same logic as D13R
- C-9 reservoir modeled as a physical feature and ACME Basin B project incorporated
- Updated Caloosahatchee and St. Lucie estuary targets
|